
Check Point 4000 Appliances Hardware
38 | Check Point 4000 Appliances Getting Started Guide
Installing the Power Supply
This section describes how to install a power supply or placeholder unit into a Check Point
4800 appliance.
To install a replacement power supply:
1. Insert the power supply or placeholder unit into the power supply slot.
2. Push the power supply or placeholder unit until the release lever clicks.
3. Insert the power cord into the power supply socket. Make sure that the green LED is
illuminated.
Expansion Line Card
This section presents the procedures for removing and installing an expansion line card unit.
There are two types of expansion cards that can be installed: Ethernet or Fiber Optic ports. The
built-in Ethernet ports (LAN1 - LAN8) are not customer replaceable.
Important - Make certain that you are electromagnetically grounded when
performing the following procedures. Static electricity can damage the appliance.
Installing Expansion Line Cards
To install an expansion line card:
1. Turn off the appliance.
2. Remove the power cords from the power supply units.
3. Loosen the retaining screws on the metal cover on the front of the appliance.
4. Holding the screws, remove the metal cover.
5. Insert the expansion line card into the expansion slot.
6. Push until the card clicks into position.
Comentários a estes Manuais